Category
Commercial Fixed Tube Grow Tent Tunnel Plastic Solar Greenhouse Clip Accessories
Overview Package Size 1380.00cm * 1380.00cm * 1380.00cm Package Gross Weight 10.000kg Product Description Detailed Photo
Overview
Good material, long service lifeQuality assurance, excellent materials, sophisticated technology production equipment, assured product quality assurance.Processing custom to meet your various needs
To meet your customized processing needs, processing is guaranteed
Basic Info.
Model NO. | XH-1207 |
Layer | Customizable |
Usage | Fixed Tube |
Application | Agricultural Cultivation |
MOQ | 100piece |
Advantage | Easy Installation, Fastening, Rust Resistance |
Payment | T/T, West Union, L/C, Paypal |
Keyword | Multispan Greenhouse |
Name | Greenhouse Clip/Clamp |
Material | Galvanized |
Color | Galvanzied |
Instruction for Use | Greenhouse |
Place of Origin | Shandong China |
Transport Package | Package by Carton |
Specification | Customizable |
Trademark | XINHE |
Origin | Qingzhou |
HS Code | 94069000 |
Production Capacity | 1000000set/Years |
Packaging & Delivery
Package Size 1380.00cm * 1380.00cm * 1380.00cm Package Gross Weight 10.000kgProduct Description
Product Description
name | Greenhouse clip/clamp |
color | galvanzied |
size | 20/22/25/32/40/48mm |
package | carton/bag |
material | Galvanized |
MOQ | 100piece |
Usage: | Fixed Tube |
Advantage: | Easy installation, fastening, rust resistance |
Detailed Photos
Solid structure to stop jerry-buildingWith sincere service attitude, help you worry; Industry experience is rich, we do really good productsGood material, long service lifeQuality assurance, excellent materials, sophisticated technology production equipment, assured product quality assurance.Processing custom to meet your various needs
To meet your customized processing needs, processing is guaranteed
Accessories
Packaging & Shipping
Company Profile
FAQ
1. How long is the delivery time?
The delivery time is from 10 days to 60 days after getting deposit. It depends on the greenhouse size.
2. How long is the warranty period?
We will supply free spare parts if any problem occurred in 12 months after installations.
3. Is your company foreign trade company or manufacturer?
We are manufacturer.
4. Can you supply sample?
Small parts can be supplied, but clients should pay the express fee.
5. When installing, what cost should we pay?
Our engineers' airline tickets, local accommodations, visa fees, etc are taken by the clients.Our engineers' salary is $200/day
per person.